Masa pandemi Covid-19 sangat mempengaruhi kondisi berbagai sektor kehidupan salah satunya adalah sektor konstruksi. By fulfilling the above requirements, it can be expected to design structures in earthquake prone areas can be done in a simple, safe, and secure way economical. In order for earthquake loads on structures that counts is not too large and the direction is quite predictable, as well as the distribution of earthquake loads can be done in a simple way, the provisions that need to be considered in the structural design of buildings in earthquake prone areas are: the layout of the structure, capacity planning with the concept of strong column - weak beam, as well as a good detailing of structural elements. time of vibration of the structure, ground conditions, earthquake zones, and earthquake behavior itself. Horizontal force, vertical force and torque moment that occur due to earthquakes in the structure, are highly dependent on the weight and stiffness of the structural material, configuration and structural systeme, period or. Magnitude earthquake loads work on building structures, depending on many variables. Earthquake loads are very unpredictable the magnitude, direction, and time of occurrence.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |